Skip to main content

Institutional Buildings

ADE Maintenance, Repair, Overhaul (MRO) Hangar, KLIA

  • START DATE

    13 September 2022

  • PROJECT TITLE

    The Construction Works on the Project for Asia Digital Engineering Sdn. Bhd. (“ADE”) MRO Hangar and New Taxiway at PT39, Lapangan Terbanf Antarabangsa Kuala Lumpur (KLIA)

  • FINISH DATE

    13 January 2025

  • CLIENT

    Asia Digital Engineering Sdn Bhd

  • DESCRIPTION OF PROJECTS
    • Consist of Hangar A and Hangar B with 153-meter single-span rafter Pre-Engineered Building (PEB) system and a 183-meter single-span truss frame system.
    • The size of mega hangar door is 142.78 meter.